Abstract: Monitoring of existing test sections that years 2004-2006 performed with normal compaction and normal thickness of bound layers and some test sections with expanded campation and a slightly thinner bound layers. Some test sections was built with a subbase with different fractions (0-90, 0-150, 0-300). All test sections are measured initially with FWD and manually in individual cross sections. The monitoring will be done by re-measuring with FWD along with visual inspection and analysis of bearing capacity and change of bearing capacity. Existing laser data of road surface will be analyzed for the whole period 2006 - 2014.